![]() The results from these drill holes are comparable to the intercepts encountered in previous drill programs, and prove the mineralization continues further at depth in the Main Zone. These include drill holes GB22-46, GB22-47. They were designed to test the vein continuity, as well as test the continuation of the copper-rich sulphide zones previously encountered. ![]() Towards the North-West part of the property, five drill holes were planned to follow up on the areas underneath T-18, GB17-21, GB18-36, and GB17-15 further down-dip of the existing structures. The drill program completed 13 drill holes for a total of 1842 meters. The 2022 drill program had a budget of CAD$500,000. The drill program was engineered to follow-up existing intercepts from the 2017-2018 drill programs in addition to testing the First Priority Targets outlined in the geophysical report completed by Simcoe Geoscience in August 2022. “We are pleased that the holes testing the extension of copper-cobalt zone have come back positive with many intervals being over 5m core length.” We are excited to continue to evaluate the mineralization along trend at the Teledyne.” Comments Tim Fernback, Fuse President & CEO. “We are pleased with the drill results from GB22-55 to GB22-58 as they suggest structures are continuing southward towards the Teledyne property. (“ the Company ” or “ Fuse ”) (TSXV:FUSE ) ( OTC:FUSEF ) ( FRA:43W3 ) is pleased to announce the Company has received assay results from the recently completed drill program at the Glencore Bucke Project located just outside Cobalt Ontario and near the cobalt refinery of Electra Battery Metals Corporation ( NASDAQ:ELBM ). Coquitlam, BC - TheNewswire - SeptemFuse Battery Metals Inc.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |